SmartClient Version: v8.3p_2013-02-28/PowerEdition Deployment (built 2013-02-28)
Just a heads up that the timeline widget fails with a java script error if setStartDate(null) or calendar.setEndDate(null). Same if the setTimeLineRange date parameters are in wrong order (start date is after end date).
Absolutely not a big deal, but it might be useful if you included some parameter checks and have it fail more gracefully.
Just a heads up that the timeline widget fails with a java script error if setStartDate(null) or calendar.setEndDate(null). Same if the setTimeLineRange date parameters are in wrong order (start date is after end date).
Absolutely not a big deal, but it might be useful if you included some parameter checks and have it fail more gracefully.
Comment