SmartClient Version: v9.1p_2014-03-18/Pro Deployment (built 2014-03-18)
I'm using the timeline and want to select/modify the timeline by selecting a date from the calendar and have the selected date be the latest time in the range as apposed to the earliest time. That is if a for a time range of 7 days selecting today from the calendar would show from today back 7 days. Looks to me like the default behavior is for the calendar to return the selected date as the oldest date with the latest date computed from the current timeline duration.
I could easily handle this (get the earliest date; compute latest and reset timeline) if I could determine when the date change event was from a calendar selection vs selection of the forward/backward arrows on the timeline.
Any guidance would be appreciated
Thanks
I'm using the timeline and want to select/modify the timeline by selecting a date from the calendar and have the selected date be the latest time in the range as apposed to the earliest time. That is if a for a time range of 7 days selecting today from the calendar would show from today back 7 days. Looks to me like the default behavior is for the calendar to return the selected date as the oldest date with the latest date computed from the current timeline duration.
I could easily handle this (get the earliest date; compute latest and reset timeline) if I could determine when the date change event was from a calendar selection vs selection of the forward/backward arrows on the timeline.
Any guidance would be appreciated
Thanks